Cs605
1.
A law diminishing that to continue
after a certain level of performance has been reached will
result in a decline in effectiveness. This law is known as :
a.Law of Diminishing returns HO
page 6
b.
Law of effectiveness
c.
Law of Saturation
d.
Law of Marketing returns
2.
Build and Fix model is a type
of software development activity.
a.
Mathematical
b.
Perfect
c.Haphazard (haphazard mean: lacking
any obvious principle of organization.)
d. Planned
3.
In a team is structured along a traditional hierarchy of authority
a.
closed paradigm HO
page 32
b.
synchronous
paradigm
c.
random paradigm
d.
open paradigm
4.
MTTC is the abbreviation of
a.
measured time to change
b. mean time to collaborate c. mean time to change
d. measure time to cope
5.
The rapid application development model is
a.
Another name for component-based development.
b. A useful approach when a customer cannot define requirements clearly
c. A
high speed adaptation of the linear
sequential model. HO page 19
c.
All of the
given
6.
![]()
When a software is delivered to a client
and then client
reports the bug in it then
that bug is termed as
b.
Defect
c.
Mistake
d. Fault
7.
A redesigned business process
must be prototyped before it is fully integrated Into the business.
a.
True
b.
False
8.
The only reason for an
estimate to be unreliable is lack of experience related to the application on
the part of the estimator.
a.true
b. false
9.
A consideration of software
scope must include
an evaluation of all external Interfaces.
a.true
b. false
10.
If an error related
to requirements is identified in testing phase, so this error will be considered as an error in phase.
·
Design
·
Code
·
![]()
Requirement
11.
There could be multiple GUIs to satisfy
one requirement
a.
False
b.
True

12. Following
are the benefits of conducting review except
a.
Help on Finding the Size of the Project
b.
Helps in Verifying the Quality of Product
c.
Help in Identifying Where improvements is required
d. Helps in
Identifying the bugs in the Work Product My Point of view
13. Usually the performance of the organization change over-night.
a.
True
b.
False
14.
Which one of the following describes
the data and control
to be processed, Function, performance, constraints, interfaces, and reliability?
a.
. Product
Quality
b.. Software scope estimation HO page 80
c. .
Resources requirements
d. . Time requirements
17.
Reliability of a software is a
a.
. functional
requirement
b.. non-functional requirement
c. .
Design Requirement
d. . None
of the given
18.
The formal methods model
of software development makes use of
mathematical Methods to
a. define
the specification for computer-based systems
b. develop
defect free computer-based systems
c.
verify the correctness of computer- based systems
d.
all of the given my Point of View
19. Water fall model is a document
driven model. a. True
b. False
20.
Spiral model has
dimensions.
a.
2 HO page 20
b. 3
c.
4
d.
None of the
above
21. The model of software development is a good approach
when core product is required quickly.
a.
Incremental HO
page 18
b.
Linear Sequential
c.
Prototyping
d.
None of the
above
22. In team
organization, there is no permanent
leader rather there are task coordinators.
a.
Controlled
Decentralized
b.Democratic Decentralized HO page 32
c.
Controlled Centralized
d.
Synchronous paradigm
23. In software development is performed at the end of
each phase. a. Verification HO page 25
b. Validation
24. paradigm, structures a team loosely
and depends on individual initiative of the team members
a. Closed
b.Random HO
page 32
c.
Open
d. Synchronous
25. Unrealistic deadline is NOT
one of the reasons of project
failure.
a. True
b. False
26.
is an Object Oriented model.
a. Spiral
b.
Water fall
c. Incremental
d.Fountain HO
page 23
27.
Vision phase in a software process focuses on .
a.
What
b.Why HO
page 14
c. How
d. Change
28.
Rapid application development is another form of
.
a.
Incremental model HO page 19
b.
Prototyping
model
c. Linear
Sequential model
d.
None of the
above
29.
Phase in a software process
focuses on change.
a. Vision
b.Maintenance HO
page 14
c.
Definition
d. Development
30. The model
of software development is a useful approach when a customer cannot define
requirements clearly.
a.Prototyping HO
page 17
b. Water fall
c. RAD
d. Build
and Fix
31. Model has a major drawback in that the delivered
product may not fulfill the
customer's requirements.
a.Water fall HO page 17
b. Build
and Fix
c.
Prototyping
d. Integrated
water fall and prototyping
32.
MOI model of leadership
stands for
a.
Motivation , Operationalize ,Integration
b.
Misunderstanding , Object, Ideas
c.Motivation , Organization , Innovation HO page 30
d. Miscommunication ,
Organization, Invention
33. The model
is used to overcome issues related to
understanding and capturing of user requirements.
a.Rapid Prototyping HO page
17
b.
Water fall
c. Build
and Fix
d. None of
the above
34.
activity is performed throughout software production
a. Maintenance
b.
Development
c.
Analysis
d.
Quality Assurance My Point of View
35. In model the product is
developed without any proper design
and specifications.
a.
Water fall
b.Build and
Fix HO page 14
c.
Prototyping
d. None of
the above
36.
software project management focuses on the
four P’s: These are
a. People
, Product , Process , Problem
b.People , Product , Process , Project HO page 29
c. People
, Passion , Process , Project
d. People
, Passion , Planning , Project
37. : The dimension in rational
unified process model represents the
dynamic aspect of the process.
a.Horizontal HO
page 24
b. Angular
c. Vertical
d. Regular
38.
model is developed keeping
in mind the element of risk
in the development of software
a.Spiral HO
page 20
b.
RAD
c.
Incremental
d. Synchronize
and Stabilize
39.
model is adopted by Microsoft
a.
RAD
b.
Build and Fix
c.
Spiral
d.Synchronize and Stabilize HO
page 19
40. teams
generate more and better solutions than
individuals and are most useful for complex problems
a.Decentralized HO page 32
b.
Centralized
c. Synchronize
and Stabilize
41.
The important feature of extreme programming
is the concept of.
a. Feedback
b.
Risk assessment
c.Pair programming HO page
23
d. Requirement
elicitation
42.
Determination of the................... is a pre-requisite of
all sorts
of estimates,
including, resources, time, and budget.
a.software
scope HO page 80
b.
software Risk
c.
software Quality
d. software Management
43. When more than one user interpret the same requirement in
different ways then we can say that
the requirements are
a. Complete
b. Incomplete
c.
Ambiguous My
Point of View
d. Incorrect
44.
The extent
to which a program satisfies its specifications and fulfills the customer’s
mission objectives is …………………
a. Integrity
b. Reliability
c.Correctness HO
page 67
d. None of given
45.
Several entities are always created------------- and deleted
together then this is a strong indication that they
should be grouped into---------- logical file/files.
a.Together,
Single HO page 48
b.
Together, Multiple
c. Together, Double
d. All of
the given
46. In case some software, it is extremely
easy to operate with intuitive interface conforming to most
excellent GUI practices of the industry. It needs very little training -----------------
a.
![]()
Less than one hour
c. Less
than five hour
d. Less
than ten hour
47. Metrics to assess the quality of the analysis models and the corresponding software
specification were proposed............
a. in 1993- 1999.
b. Ricado
in 1993
c.
Davis in
1993 HO page 71
Davis
in 1990
d.
48.
Function/Test matrix is a type of
a.
Interim Test
report
b.
Final test
report
c. Project status report My
Point of View
d. Management report
49.
The higher the Error Index, the higher
will be the Defect Removal
Efficiency
a. True
b. False
50.
help in finding the matrix to be stable or unstable
a.
Control chart HO
page 75
b.
Directed
Graph
c. Cyclic chart
d. Base
line graph
51.
![]()
This chart is then used to develop the individual control
chart is called statistical
control techniques.
b. Yes
52. In measuring Software
Process Quality by using control
charts, if the gap between the defects reported and defects fixed is increasing, then it means
a.The product is in unstable condition HO page 78.
b.
The product is ready for shipment
c. The
product is in stable condition.
d. None of
the above
53.
A --------------entity is the one which have any---------- in the
problem domain without some other entity.
a. Strong, Role*
b.
All of the
given
c.
Weak, Function
d.None of the Given HO page 47
54. give
you a better insight into the state of te
process
or product. a. Metrics HO page 66
b. Exceptions
c. Errors
d. Threats
55. The most important objective of any engineering activity is
to produce high quality product with limited resources and-
![]()
a.Time HO page 66
b.
Persons
c. Cost
d.
Metrics
56.
The extent
to which a program satisfies
its specification and fulfills the customer’s mission
objectives is said to be achieving the
a.Correctness HO
page 67
b.
Reliability
c.
Efficiency
d. Usability
57.
ILF is a--------------- identifiable
group of logically control in
formations ------------- the boundary the application.
a.user, within HO page
42
b. user, without
c. All of
the given
d. user, along
58............ technique was initially developed for manufacturing
processes in the 1920’s by Walter Shewart.
a.
Upper Control Line
b.Control chart Ho page 75
c.
CMP
d.
Quality
59.
Integrity means that the software should
a.
. help the users to enjoy usability
b.
. none of the given
c..... withstand the attack from a hacker HO page 67
d. . help
the hacker to hack the system
60. In
function point analysis technique EO stands
for
a.
. Export operation
b.
. Export output
c.. External
output ` HO page
49
d. . None of these
61.
Which of these software characteristics are used to determine the scope of a software project?
a.
. context, Lines of code, function
b. . context, function,
communication
c.
. information objectives, function, HO
e. . communications
requirements, performance, information objectives
62.
In a team is structured loosely and depends
on individual initiative of
the team members
a.. random paradigm HO
page 32
b.
. closed paradigm
c.
. synchronous paradigm
d.
. open paradigm
63.
is the first stage of
waterfall lifecycle model
a.. Requirement definition Ho page 15
b.
. Operation
c.
. Unit testing
d.
. Implementation
64.
is not the part of software
development loop.
a.
. Status Quo
b.
. Problem definition
c.
. Technical development
d.. Task set HO
page 10
65.
is not the management part
of software development activities.
a.. Coding HO page 7
b.
. Configuration Management
c.
. Quality Assurance
d.
. Project planning
66.
The level 1 of CMM is known as
a.
Managed
b.
Defined
c.
Initial HO
page 12
d.
Repeatable
67.
According to DeMarco a good Project Manger
a.
should be very nervous
b.
should be very strict in official matters
c.
Should not ignore any mistake from his team members.
d.
should have a big heart and should
ignore small mistakes HO page31
68.
Product and process decomposition occurs simultaneously as the project plan evolves
a.
True My Point of View
b. False
69.
The best project team organizational model to use when tackling extremely difficult problems is the
a.
chief programmer
team model
b.democratic decentralized model HO
page 32
c.
controlled decentralized model
d.
controlled centralized model
70.
Which factor is the least important
when choosing the organizational structure for a software team?
a.
degree of communication desired
b.
predicted size of the resulting program
c.
![]()
Rigidity of the
Delivery Date
71.
The Spiral model of software
development is of Iterative
nature
a. true
b. false
72.
is data that influences an elementary process
of the application being counted.
a.
Elementary Process
b.
External Query
c.
External Output
d.Control Information HO page 43
73.
An
entity which defines
many-to-many relationship between
two or more entities is called
a. Associative Entity Type HO
page 47
b.
Attributive Entity
Type
c.
Entity Subtype
d.
None of these
74.
From the following listed
software development Model,
which one is an object oriented model
a.
. Classical life cycle model
b.. Fountain model HO
page 23 Conceptual
c.
. Spiral model
d.
. Waterfall model
75.
The prototyping model of software development is
a.
a reasonable approach when requirements are well defined.
b.
a
useful approach when a customer
cannot define requirements clearly.
c.
the best approach to use for projects with large
development teams.
d.
a risky model that rarely produces a meaningful product.
76.
is a team
organization where there is no permanent leader and task coordinators are
appointed for short duration. Decisions on problems and approach are made by group consensus and communication among
team is horizontal.
a.Democratic
decentralized (DD) Ho page 32
b.
Controlled decentralized (CD)
c.
Synchronous paradigm (SP)
d.
Controlled centralized (CC)
77.
A is a user recognizable subgroup of data elements within an ILF or
EIF
a.
Record element type (RET) HO page 46
b.
Data Element Type
c.
External Input
d.
External Query
92.................................. subgroups
are those that the user has the option of
b. c. d.
using one or none of the subgroups during an elementary process. a....... Optional HO page
46
. Mandatory
. None of the
Given
. RET
93. In the software development life cycle, soon the defect
is detected will results
in
a.
increase in cost of software
b.
decrease in software cost
c.
both a and b are correct
94. During the construction of software, defects can be prevented from being injected in
software with the help of
a.
proper education and training of software engineers
b.
use of formal methods
c.
use of appropriate tools for
testing
d. all of the given option are correct
95.
Incomplete requirements gathering
can result in the of the project
![]()
b.
reusability
c.
success
d.
easy maintenance
96.
The root causes of project failure are
a.
lack of user
input
b.
incomplete requirement and specification
c.
creeping requirement
d.all of the given options HO
page 29
97.
![]()
The
template for organizing SRS given by American Department of Defense and NASA
should be used for
b.
small project
c.
medium size projects
d.
none of the given
98.
Configuration Management can be used while the
project is in the phase
a.
Testing
b.
Development
c.
Maintenance
d.All of the given HO
page 9
99.
Extent to which access
to software or data by unauthorized persons can be controlled, is called
a.
None of given
b. Efficiency
c.
Reliability
d.
Integrity HO
page 67
100.
![]()
By default every organization is working at
b. level 0
c. level 3
d. level 4
101.
Caper Jones is famous
researcher in the field of _ who made a company named Software Productivity Research
a.
Biology
b. Chemistry
c.
Mathematics
d.Software Engineering HO page 7
102. In
Capability Maturity Model (CMM), performs optimization.
a.
level 1
b. level 2
c.
level 3
d.level 5 HO page 12
103.
A PM has to first come up with the schedule
and then monitor
theof the project to ensure
that things are happening according to the schedule. It would not be out of
place to quote Fred Brooks at this point. He says, "Projects fall behind schedule
at a time."
a.
Schedule, Two day
b. Schedule,
Two day
c.
Progress, Three day
d.Progress, One day HO
page 92
104.
Continuous process
improvement is enabled by feedback
from the
a.
analytical,
user
b. mathematical, user
c.
logical, process
d.qualitative, process HO page
12
105. can be a reason of project failure.
a.
Realistic
deadline
b. Requirement
c. Miscommunication HO page 29
d. Small
project size
106.
The model of software development is a useful
approach when a customer cannot define requirements clearly. a.Prototyping HO page 17
b. Water fall
c. RAD
d. Build
and Fix
107. Defects
per function points is a -
a.
Measure
b.Metric HO
page 65
c. Quality attribute
d. Process
108. A provides a quantitative value
of some attribute of a process or a
product.
a.
Metric
b.Measure HO
page 65
c. Function point
d. Plan
e. Maintenance
f. Development
g. Analysis
h.Quality Assurance HO page 25
109. is an object-oriented lifecycle model.
a.
Spiral model
b. Extreme programming
c.
Waterfall model
d.Fountain model HO page 23
110.
In controlled centralized structure communication between
team leader and the members is -
a.
horizontal
b. linear
c. vertical HO page 32
d. circular
111. Effective software
project management focuses
on the four P's: These are
a.
People, Product , Process , Problem
b.
People, Product , Process , Project HO
page 29
c.
People, Passion , Process , Project
d.
People, Passion, Planning, Project
112. Software
relates individual software measures to provide a normalized
view.
a.
Measure
b.Metric HO
page 65
c. Plan
d. Attribute
113. is the ability
to encourage people to create
and feel creative.
a.
Organization
b. Motivation
c. Innovation HO
page 30
d.
Managerial
Identity
114.
In there is both vertical and horizontal
communication.
a. Controlled
decentralized (CD) HO page
32
b. Democratic
decentralized (DD)
c.
Controlled centralized (CC)
d.
Synchronous paradigm (SP)
115.
The amount
of "computing resources" required by a program to perform its function is called
a.Efficiency HO
page 67
b. Integrity
c. Reliability
d. Portability
116. Which
statement is correct?
a.
Coupling does not depend on interdependency be we components
b. The greater
the dependency between
the components the lesser is coupling
c. The lesser the dependency between
the components the greater is coupling
d. The greater the dependency between
the components the greater is coupling My Point of View
117. Requirements are sometimes fill with defects,
normally known as
requirements.
a.
Functional
requirements
b.
![]()
Non-Functional requirements
d. System requirements
118. The major activities related
to software construction are:
a.Requirement gathering, design development, coding and
testing (pg8)
b. installation
and training
c. quality
assurance, configuration and planning
d. implementation
and management
119. Which
of the following is not a software measure?
a.
![]()
No. of defects
c. Lines of Code
d. Non Function
points
120. Capability
Maturity Model (CMM) has levels
a.
4.
b.5 H O
page 12
c. 3
d. 2
121.
model is a haphazard type of software
development activity.
a.
Water fall
b. Incremental
c.
Prototyping
d.Build and Fix (haphazard mean: lacking any obvious principle of organization.)
122.
The conceptual interface between
the 'internal application and the external'
user world is known as-------
a.
Count Data
Functions
b.Application Boundary HO page 42
c. Development count
d. Control
Information
123.files are the logical files
that the customer
understands and
must be maintained by the system.
a.
Raw
b. External
c.
Logical
d. Internal HO page 42
124.
Lifecycle models appreciate the need for iteration
within and between phases.
a.Object-Oriented HO page 23
b. Spiral Model
c. Extreme Programming
d. Rapid
Application Development
125.
![]()
dimension of Spiral model represents the cumulative cost to date
b. Angular
c. Horizontal
d. Circular
126.
- files are the logical files that
the customer understands and must be maintained by the system.
a.
Raw
b. External
c.
Logical
d. Internal HO page 42
127.
Lifecycle models appreciate the need for iteration
within and between phases.
a.Object-Oriented HO page 23
b. Spiral Model
c. Extreme Programming
d. Rapid
Application Development
128.
![]()
dimension of Spiral model represents the cumulative cost to date
e. Angular
f. Horizontal
g. Circular
129.
In _ team organization, there
is no permanent leader rather there are task coordinators
a.Democratic decentralized HO page 32
b. Controlled decentralized
c. Synchronous paradigm
d. Controlled centralized
130. Caper
Jones divided software related activates into different categories.
a.
35
b. 40
c.
20
d.25 HO page 7
131. Software Process
and product quality
are controlled at
a.
Level 1
b. Initial level
c.Level 4 HO page 12
d. Level 3
132.
The
conceptual interface between the ‘internal’ application and the ‘external’ user world is known as
a.
Count data
Function
b.Application Boundary HO page 42
c. Development Count
d. Control Information
133. Capability
Maturity Model (CMM) is used to judge the level
of an organization
a.
Efficiency
b. Performance
c.
Productivity
d.Maturity HO
page 12
134.
In model user feedback is received very quickly
because product is delivered in small version
a.
Waterfall
b.
Spiral
c.
Incremental HO
page 18
d. Object oriented
135.
The primary difference between
an internal logical file and an external interface file is that
is not maintained by the
application being counted
a.
ILF
b. RET
c.
DET
d. EIF HO
page 42
136.
Once the higher management
has devised the mitigate strategy , the project must be monitored for this
a.
Particular
Task
b. Particular Requirement
137.
MOI model of leadership was developed by
a.
Newton
b.
Weinberg My Point of View
c.
Don Carlos
d.
Edison
138. Empirical
models are statistical
models
and are based upon
a.
Historic data HO
page 81
b. Control data
c.
Current data
d.
Statistical
139.
The dimension in rational unified process
model represents the dynamic aspect of the process.
a.Horizontal Ho
page 24
b. Angular
c. Vertical
d. Regular
140. In the context of statistical models,
COCOMO stands for:
a.
Computer Company Model
b. Commutative
Conduct Model
c.Constructive Cost Model HO
page 81
d. Conductive Cold
Model
141.
is
necessary to learn from the mistakes and
for the improvement of the process continuously
a.
Risk analysis
b. Good decision
c.
Improvement
d.Postmortem analysis HO page 35
142.
is the
ability to encourage technical
people to produce to their best.
a.
Improvement
b.Motivation HO
page 30
c. Innovation
d. Creation
143. Which
of the following is a Software Metric?
a.
No. of defects
b. Lines
of Code
c.Defects per function point HO
page 65
d. No. of function
points
144. Construction activities are directly related
to the _ of the software.
a.
installation
b. risk analysis
c.development HO
page 8
d. debugging
145. The size of software
can be measured by using
a.
No. of Items
b.
No. of classes
c.Functional points HO page 65
d. No. of methods
146.
Defect removal efficiency is
calculated as Where
E = errors found
before delivery
D-errors found after
delivery (typically within the first year of Operation)
a.
DRE = ExE.D)
b.
DRE = E-D
c.
DRE = E.DE
d.DRE = E/(E+D) HO
page 69
147.
Reel has defined
steps process to improve
the chances of success.
a.
3
b. 4
c.5 HO page 35
d. 8
148.
If an employee number which
appears twice in an ILF/EIF, count the DET
a.
twice
b. thrice
c.once HO
page 45
d. null
149.
After passing through all
the stages of the software development when we deploy the new system at the
user side that stage is called
a.
Integration
b.
Development
c.
installation
d.Status quo HO page 10
150.
![]()
Model is
very sensitive to the risk
b. Waterfall
c. Incremental
d. RAD
151.
Barry Boehm has suggested a systematic approach
to project management which is known
as
a. W5HH Principal HO page 35
b. W3HH Principal
c.
WHH Principal
d.
5W5HH Principle
152. A mock
up application is developed in model
to get user feedback
a.
Waterfall
b.
Objected oriented
c.
Fountain
d.Rapid prototyping HO page 17
153. Software
has very close relationship with
a.
Biology
b.
Physics
c.
Chemistry
d.Economics HO
page 5
154. LOC is
heavily dependent on the -----
a.
No of document pages
b. No of objects
c.
No of GUIs
d.Programming Style HO page
37
155. Software
engineering is the set of and to develop
software
a.
Classes, Objects
b. Languages, processes
c.Processes, tools HO page 4
d. Tools, objects
156. Which
of the following is not software metric?
a.
Defects per function point
b.No of test cases per
function points My Point of View
c. No of defects
d. No of errors per
thousand lines of code
157.
If a software developer is
going to develop software for a nuclear reactor which factor(s) will be more important?
a.
Cost effective
b.
Performance
c.
Reliability
d.Performance and reliability HO page 6
158.
If an experience user has to
take an extensive training of
software before use and he/she still finds difficulty to use it, we can say there may be issues related to the
![]()
b.
Portability
c.
Correctness
d.
Reliability
159. Spiral
model was first proposed by
a.
Mecabe
b.Barry Boehm HO page 20
c.
Robert Cazeman
d.
William Smith
160. An is the smallest unit of activity
that is meaningful to the user(s)
a.
Function Point
b.Elementary
Process HO
page 43
c.
Adjustment
factor
d.
Data count
161. W5HH
principal consists of seven
a.
Answers
b.
Questions PG
35
c.
Points
d.
Steps
162.
After passing through all
the stages of the software development when we deploy the new system at the user side that stage is
called
![]()
a.
Integration
b. Development
c.
installation
![]()
d.Status quo HO
page 10
163.
![]()
of
a product can be measured
if we can measure its non-functional
properties i.e. maintainability, integrity and
usability
page 68
b. Quantity
c. Price